Home /

YOUR PROJECT. YOUR PAPERWORK.

What documents
do I need?

A clearer starting point for your application. Choose your state and proposed work to see the forms, plans and supporting information to prepare.

01 Select your project02 Review your checklist03 Prepare your documents

APPLICATION DOCUMENT FINDER

The right paperwork.
For your project.

Start with your state and proposed work. Your checklist updates as you select the approval pathway and building arrangements.

Not sure yet? Select that option and we’ll show you a practical starting point for a conversation with our team.

This guide helps you prepare. iPermit confirms the documents needed for your site, building class and scope. It does not determine approval eligibility or permission to start work.

Discuss your application

A checklist that fits the work.

A pool application needs different drawings from a home extension or commercial project. Choose your state above to begin.

NSW

NEW SOUTH WALES

Understand
the full process.

The contract, supporting documents, Planning Portal and separate principal certifier appointment, explained in order.

Read the NSW application guide
VIC

VICTORIA

From appointment
to building permit.

The owner’s appointment, correct Form 1, application pack and assessment, through to inspections and completion.

Read the Victorian application guide

A FEW USEFUL DETAILS

Before you
press send.

What if I do not have plans yet?

You can still start a conversation. Share the property address, proposed work, estimated cost and any available drawings or approvals. Tell us what is still being prepared so we can explain the next steps.

Does this show every document my project will need?

It is a preparation guide tailored to your selections. Site conditions, building class, design details and existing approvals can change what is needed. iPermit confirms the project-specific requirements and may request further information during assessment.

Do I need every document in Resources?

No. Resources includes application forms, completion certificates and specialist reference material. Start with the links in your checklist and confirm the applicable items with us. Existing reference documents may use earlier terminology or thresholds; our team confirms current requirements.

How should I organise my attachments?

Use clear filenames and drawing revision dates, provide the latest coordinated plans and explain any changes. Upload NSW application documents to the Planning Portal. For Victoria, use the property address and any project reference in your email subject. Ask us how to share large files.

I need an inspection, not a new application.

Have the property address, permit or project reference, inspection stage, site contact and access details ready. For an existing pool barrier, include the council letter or previous inspection record. Contact us to confirm inspection arrangements.

What about an amendment or existing appointment?

Contact us before making a new application. Tell us about existing approvals, work already started and any certifier or surveyor already appointed. Amendments, extensions and changes of appointment need a project-specific discussion.

About this checklist and official guidance

Prepared from iPermit’s application documents and official guidance checked 17 October 2026. The document finder does not assess legal compliance or determine an approval pathway. Requirements and forms can change; confirm the current requirements with our team.

Apply to iPermit using the process in your selected checklist. The council guidance above is a supporting reference, not an instruction to appoint the council as your building surveyor.

CURRENT CLIENT GUIDANCE

Check the requirements
before you apply.

Understand the NCC edition for your project, Victorian Form 26 and the separate NSW principal certifier appointment.

Read the 2026–27 building approval updates

Website guidance checked 15 October 2026.

LET’S TALK ABOUT YOUR PROJECT

The next step starts
with a conversation.

Discuss your project