SHEDS, GARAGES & CARPORTS / NSW + VICTORIA

Shed, garage &
carport permits.
Made clearer.

Building permit and certification guidance for domestic sheds, garages and carports. Start with the intended use, dimensions and property details so the approval pathway can be checked.

01

The structure and the site both matter.

A supplier’s standard design does not explain where the structure will sit, how the site drains or how you intend to use it. Share that information before committing to a layout or starting work.

Some minor work may be exempt, but a small building is not automatically exempt. The state rules, property constraints and proposal need to be considered. A shed intended for a business, accommodation or another use should be identified at the outset.

NEW SOUTH WALES

Certification pathway.

The proposal may be exempt, eligible for complying development, or require development consent followed by a Construction Certificate. We discuss the relevant certification service once the site and scope are known.

NSW document checklistNSW application process

VICTORIA

Building permit pathway.

Confirm whether a building permit is required and whether separate planning permission or council consent applies. A building permit application needs site-specific information as well as the structure’s design.

Victorian document checklistVictorian application process

02

Make the site information as clear as the design.

  1. Use, size and estimated cost

    Describe what the shed, garage or carport will be used for, its dimensions and height, whether it is attached to another building and the estimated cost of works.

  2. Location on the property

    Provide an available site plan showing boundaries, setbacks, easements, existing buildings, proposed levels and drainage arrangements.

  3. Structure and foundations

    Include supplier drawings, engineering and footing or slab details available for the site. Identify any soil report or other supporting design information already prepared.

  4. Existing approvals and building arrangements

    Send any development consent, planning permit or relevant property information. Tell us whether you will use a builder or apply as an owner-builder.

03

Resolve the placement before installation.

Flag an easement, boundary issue or uncertainty about the intended use early. Changes to the location, height or design can affect the documentation and assessment.

Once approval is in place, confirm the inspection stages and required completion documents with the team. Keep the approved drawings and permit or certificate details with the builder.

BEFORE YOU APPLY

A few useful answers.

Do you arrange the engineering for a kit shed?

Send the design and engineering supplied with the kit. We identify further information needed for assessment, but do not assume the supplier’s documents cover every site condition. Any additional design services need to be arranged and confirmed.

What if the shed will be used for my business?

Describe the proposed activities, occupancy and storage. The building use matters, even if the structure resembles a domestic shed. Our commercial project guide is a useful starting point.

Can I get a quote before all the drawings are ready?

Yes. Provide the address, intended use, approximate size, estimated cost and the plans available so far. We can clarify the scope and next steps; the formal assessment needs the required supporting documents.

LET’S TALK ABOUT YOUR PROJECT

The next step starts
with a conversation.

Discuss your project