Common questions about construction details, product evidence and preparing for inspection. Start here, then confirm what applies to your project.

Reviewed

Read the scope first. Items 1–3 explain specified NCC 2022 Housing Provisions; they do not apply unchanged to every building, edition or compliance pathway. Open a question to see its qualifications and official references.

MASONRY / NCC 2022

Where should the damp-proof course be located?

Keep the damp-proof course identifiable and check its height against the finished external surfaces before paving, landscaping or rendering conceals it.

A damp-proof course (DPC) helps prevent ground moisture rising through masonry. A cavity flashing drains moisture out of the wall; one component can sometimes perform both functions.

Where the NCC 2022 Housing Provisions pathway applies

Clause 5.7.4(1)(b) requires DPCs and flashings to run continuously through the wall or pier and remain visible at the outside face. The following table summarises the common clearances in Clause 5.7.4(2). These are DPC clearances, not finished slab heights.

DPC height above adjacent finished surfaces — NCC 2022
Surface or situationMinimum clearance
Adjacent ground150 mm
Paved, concreted or landscaped surface sloping away from the wall75 mm
Weather-protected surface beneath a carport, verandah or similar, also meeting Clause 3.3.3(b)(ii)50 mm

Low-rainfall exception: Clause 5.7.4(2)(d) also specifies 15 mm above finished paved, concreted or landscaped areas in low rainfall intensity areas, or 0 mm where additionally protected from direct weather. Confirm that this exception actually applies to the site and design; it is not a general permission to cover a DPC.

Which locations need attention?

  • The bottom perimeter of walls built on a slab, and walls and piers beneath suspended floors.
  • Where masonry passes through a roof, or a roof meets an external masonry wall.
  • Window and door sill and head locations, with the detailing in Clause 5.7.4(3). The head-flashing exception requires an eave wider than three times the masonry veneer height above the opening.

Check the complete masonry pathway

The Housing Provisions are one compliance pathway. AS 3700 or AS 4773.1 together with AS 4773.2 may be the nominated alternative for a Class 1 project. Do not combine selected details from different pathways. Building Commission NSW distinguishes DPCs from cavity flashings: some flashings that do not act as a DPC may finish short of the outside face under the relevant standards.

Where AS 4773.1 is the nominated design standard, check Clause 14.8.2 for DPC positioning, alongside the construction requirements of AS 4773.2 and the approved details.

Link to this question
FINISHED LEVELS / NCC 2022

What clearances and falls are needed beside paving or concrete?

Set the paving level and fall before it is poured. A surface that covers the DPC or blocks required weepholes can compromise wall drainage and prevent compliance being verified.

Check three separate details together: the DPC clearance under Clause 5.7.4, drainage through required weepholes under Clause 5.7.5, and the finished surface falls and slab heights under Clause 3.3.3 of the NCC 2022 Housing Provisions.

Surface falls beside a Class 1 slab-on-ground — Clause 3.3.3(a)
SituationMinimum fall away from the building
Reasonably impermeable surface, such as concrete or clay paving, in a low rainfall intensity area25 mm over the first 1 m
Reasonably impermeable access path or ramp provided under Livable Housing Design Standard Clauses 1.1(2) or (4)(c)25 mm over the first 1 m
Other cases within the scope of this clause50 mm over the first 1 m
Finished slab height above external surfaces — Clause 3.3.3(b)
Adjacent surfaceMinimum slab height above it
Impermeable paving or concrete sloping away in accordance with Clause 3.3.3(a)50 mm
Finished ground in a low rainfall intensity area, or a sandy, well-drained area100 mm
Other cases within the scope of this clause150 mm

Accessible entries need their own coordinated detail. Clause 3.3.3 has a limitation for a landing provided under Clause 2.3 of the Livable Housing Design Standard, except its Clause 2.4 channel drain or drainage surface. Clause 5.7.5 also has specific weephole exceptions. Confirm the approved entry and drainage design rather than applying these tables in isolation.

Read Item 1: damp-proof course location

References & further reading

Link to this question
NSW / NCC 2022

Is the black plastic under my slab suitable in NSW?

Black plastic is not automatically compliant or non-compliant. In NSW, the required membrane grade, branding and installation matter more than its colour.

For projects using NCC 2022 Housing Provisions Schedule 5, NSW 4.2.8 applies beneath a Class 1 slab-on-ground and a Class 10 slab continuous with that Class 1 slab.

NSW under-slab membrane checks — Clause NSW 4.2.8
CheckWhat to confirm
01 / MaterialNominal 0.2 mm polyethylene film with high impact resistance, assessed under AS 2870 Clause 5.3.3.3.
02 / IdentificationContinuous branding: “AS 2870 Concrete underlay, 0.2 mm High impact resistance”.
03 / InstallationAt least 200 mm lap at joints; service penetrations taped or sealed with a close-fitting sleeve; other punctures fully sealed using additional film and tape.
04 / CoverageThe whole underside of the slab, including internal and edge beams, underlaid and extending to ground level as shown in Figure 4.2.8.

The NSW note permits different film colours, including black and orange, where the required high-impact criteria are met. The correct clause references are NSW 4.2.8(2) for material, (3) for branding, (4) for installation and (5) for placement.

References & further reading

Link to this question
PRODUCT EVIDENCE / NSW + VIC

Is providing a CodeMark certificate all I need to do?

Not by itself. A CodeMark certificate is evidence for its stated scope and conditions; it is not an approval of the whole project.

  1. Check the certificate. Confirm it is current and applies to the exact product or system and relevant NCC edition.
  2. Match the proposed use. Check the building class, installation details, limitations and every applicable condition.
  3. Identify what it covers. Establish which NCC provisions or Performance Requirements it addresses and what remains to be demonstrated for the project.

Does CodeMark replace the performance-solution process?

A certificate covering Performance Requirements supports a Performance Solution; it does not turn the product into a Deemed-to-Satisfy system. ABCB guidance says the A2G2(4) process does not need to be repeated where the certificate fully addresses all relevant Performance Requirements. If coverage is incomplete, further assessment and the applicable performance-solution process are needed for the gaps.

What about a weatherproofing risk score?

If the certificate requires a risk score, document it and satisfy the relevant conditions. Our calculator assists with Table H2V1a; select the applicable NCC edition. The score alone does not establish full H2V1 compliance, satisfy every certificate condition or approve the cladding system.

RELATED IPERMIT TOOL

Weatherproofing risk assessment

Prepare the risk score as one part of your supporting information.

Open risk calculator

And EPS foam cladding?

Do not assume an expanded polystyrene (EPS) wall system is Deemed-to-Satisfy because it has a CodeMark certificate or meets a risk-score limit. Confirm the complete system’s compliance pathway, including weatherproofing, fire safety, structural and other applicable requirements, and any product restrictions. Any requirements outside the certificate’s scope still need suitable evidence.

Understand the performance-solution process

Link to this question
ROOF DRAINAGE / NSW + VIC

What makes a rainhead and overflow compliant?

A rainhead needs a compliant overflow arrangement, not simply an opening somewhere in its face. Confirm the design before it is fabricated or installed.

A rainhead receives water from a box gutter and directs it to a downpipe. Its overflow provides a route for excess water if the outlet is blocked. The sizing and arrangement must be assessed as part of the complete roof-drainage system.

Is there only one Deemed-to-Satisfy option?

For a rainhead, the prescribed arrangement described in BPC Practice Note RP 02 uses a full-width overflow weir, with its crest at least 25 mm below the box-gutter sole and the front fully open above the weir. The sole is the bottom of the gutter. This is a summary of that detail, not a complete sizing or fabrication instruction.

It would be too broad to say that every other box-gutter arrangement requires a Performance Solution. A correctly designed sump with a side overflow or high-capacity overflow can also follow a Deemed-to-Satisfy pathway.

Confirm the proposed overflow detail
ProposalWhat needs to happen
Prescribed rainhead or sump arrangementVerify the complete geometry, sizing, installation and discharge against the applicable standard.
A slot, round hole, inverted outlet or shrouded rainhead used instead of the prescribed open-front detailThese are not the DtS rainhead detail described in RP 02. Redesign to comply, or establish an appropriate Performance Solution.

What does a Performance Solution involve?

  1. Define the proposal

    Identify the departure and relevant Performance Requirements with an appropriately qualified roof-drainage practitioner. Prepare the required performance-based design brief with the relevant stakeholders.

  2. Demonstrate performance

    Assess the whole arrangement, including design flows, blockage, overflow capacity and safe discharge. Provide calculations, testing or other appropriate evidence.

  3. Document and coordinate

    Record the assessment, conclusions and installation conditions. Coordinate the solution with the relevant building surveyor or certifier and plumbing practitioner before work proceeds.

A product brochure, installer’s assurance or a hole added after installation does not, by itself, document a compliant Performance Solution.

Check the applicable edition. RP 02 is a 2023 practice note. BPC advises that Victorian plumbing work commenced on or after 20 October 2025 must comply with AS/NZS 3500.3:2025. Confirm the edition, state variations and project requirements before relying on older details.

Read more about performance solutions

Link to this question

APPLY IT TO YOUR PROJECT

Need a specific answer?

Send the project address, relevant plans or photographs and a clear description of your question. Our team can discuss the appropriate next step.

Contact our team

LET’S TALK ABOUT YOUR PROJECT

The next step starts
with a conversation.

Discuss your project